INDUSTRY

Advantages of green building

industrialization of fabricated steel structure

 

企业优势

Controllable quality

  • Factory standardized production, the size is accurate to mm
  • On site assembly construction
  • Less concealed works, transparent and controllable quality

 

企业优势

Controllable construction period

  • The on-site labor volume is reduced by 60% - 70%
  • The construction period can be shortened by 1 / 3-1 / 2
  • The construction is less affected by weather and climate

 

企业优势

Controllable cost

  • Accurate calculation of quantities
  •  
  • There are few engineering changes and visas, and the cost is easy to control.
企业优势

Highlight social responsibility

 

  • Truly build a "big earthquake can not fall" safe home, so that building care for life becomes a reality;
  • The indoor occupancy rate increased by 5-8%, so that residents can benefit effectively.
  • Excellent wall thermal insulation performance and reduce operation energy consumption;

 

企业优势

Remarkable social, economic and environmental benefits

  • Develop green buildings, reduce comprehensive carbon emissions by nearly 40%, fulfill corporate social responsibility and enjoy central and local financial incentives;
  • The dust, noise and sewage on site are reduced by more than 80%, reflecting the civilized construction site.
  • Improve housing quality, deliver in advance, speed up capital turnover and save financial costs.
  • The number of underground parking spaces has increased by more than 10% - 15%, and its economic benefits are significant.

Application advantages of fabricated steel structure school:

1. The plane of the school building is regular, with the frame structure system as the main structure, which can give full play to the advantage of large span of steel structure;

2. The project is located in Deqing County, Huzhou City, with a total construction area of 50000 m2. All of them adopt the fabricated steel structure building integration system, and the proposed method is adopted for the basement. The total construction period of EPC is 180 days. Internal and external walls, integrated decoration complete set of technical system, on-site building block assembly construction, high product precision and fast construction period.

3. The steel column has three floors and one section, and the three floors are operated at the same time. Various types of work, processes and cross operations significantly shorten the construction period.

4. The excellent earthquake resistance of the building allows teachers and students to focus on teaching without worries

5. Combination cost advantage first

6. The building space is transparent, the lines are simple, beautiful and fashionable;

7. Green environmental protection, energy conservation and low carbon, and realize the national resource reserve of steel in construction.

 

 

临安西林小学
$info.summary
Details 白箭头 黑箭头

Mianyang fule International School EPC project

 

The project is located in wuliliang, Youxian District, Mianyang City, Sichuan Province. It is the first fully assembled steel structure earthquake resistant school built according to international standards in China. It is a boarding private junior middle school with 99 classes and 4500 students.

临安西林小学
$info.summary
Details 白箭头 黑箭头
四川理工学院宜宾校区白酒学院
$info.summary
Details 白箭头 黑箭头
萧山南都小学
$info.summary
Details 白箭头 黑箭头
萧山南二路小学
$info.summary
Details 白箭头 黑箭头
绵阳富乐国际学校
$info.summary
Details 白箭头 黑箭头
台州华东师范大学附属中学
$info.summary
Details 白箭头 黑箭头

Application advantages of fabricated steel structure residence:

 

The comprehensive cost is basically the same as that of concrete: about 15% above the ground and 20% underground

Shorten the construction period by 350 days: save 100 million yuan of financial cost

655 more underground parking spaces

Comprehensive carbon emission reduction of 36.8%: main materials can be recycled and reused, and construction waste can be reduced by 60%

Reduce environmental pollution: reduce noise, dust and sewage by 80%; Resource utilization of industrial waste

The indoor occupancy rate increased by 5.8%: the column section decreased, and the new wall became thinner

Seismic performance has been greatly improved: strong columns, weak beams and strong joints

Underground effective space saving: steel beam web opening wiring, saving net height

Facilitate the transformation of house type: large column network is easy to change from small house type to large house type

The facade is fashionable and beautiful

 

 

 

杭州市钱江世纪城人才专项用房 一期二标段项目
该项目位于杭州市萧山区钱江世纪城,由东南网架……等殊荣。 一期二标段项目
临安西林小学
$info.summary
Details 白箭头 黑箭头
四川理工学院宜宾校区白酒学院
$info.summary
Details 白箭头 黑箭头
萧山南都小学
$info.summary
Details 白箭头 黑箭头
萧山南二路小学
$info.summary
Details 白箭头 黑箭头
绵阳富乐国际学校
$info.summary
Details 白箭头 黑箭头
台州华东师范大学附属中学
$info.summary
Details 白箭头 黑箭头

Application advantages of fabricated steel structure in hospital:

 

Southeast grid carries more than 30 years of technology and management experience in the steel structure industry, and with the help of the experience in project planning, construction, team construction and operation management of Zhejiang Xiaoshan hospital, a large general hospital controlled by southeast grid group, effectively promotes the integrated development of steel structure fabricated hospital architecture with EPC and PPP.

 

1. The comprehensive cost is basically the same as that of concrete: about 15% above the ground and 20% underground

2. Shorten the construction period by 350 days: save 100 million yuan of financial cost

3. Meet the high star rating requirements of the evaluation standard for green buildings and the evaluation standard for prefabricated buildings;

4. Green and low-carbon, energy conservation and environmental protection, earthquake resistance and safety;

5. The building is beautiful and fashionable, in line with the trend of the new era of beautiful atmosphere, simplicity and practicality;

6. Transparent space and easy function transformation;

7. The comprehensive cost advantage is significant.

 

杭州市临安区人民医院及妇幼保健院迁建项目一期EPC工程
本项目位于杭州市临安区锦南新城区块,按综合三甲医院建设。 ……工程施工及总承包管理等。总工期1000日历天。 一期二标段项目
临安西林小学
$info.summary
Details 白箭头 黑箭头
四川理工学院宜宾校区白酒学院
$info.summary
Details 白箭头 黑箭头
萧山南都小学
$info.summary
Details 白箭头 黑箭头
萧山南二路小学
$info.summary
Details 白箭头 黑箭头
临安西林小学
$info.summary
Details 白箭头 黑箭头
四川理工学院宜宾校区白酒学院
$info.summary
Details 白箭头 黑箭头
萧山南都小学
$info.summary
Details 白箭头 黑箭头
萧山南二路小学
$info.summary
Details 白箭头 黑箭头
绵阳富乐国际学校
$info.summary
Details 白箭头 黑箭头
台州华东师范大学附属中学
$info.summary
Details 白箭头 黑箭头

Advantages of prefabricated steel structure public building industry

 

  • Give full play to the industrial advantages of large span of fabricated steel structure;
  • Fully meet the requirements of designers and business modeling, and adapt to different architectural styles;
  • Fully meet the functional requirements of large public building space, concentrated flow of people, atrium style and large overhang;
  • The building has excellent seismic performance and high safety;
  • The underground space layout of fabricated steel structure has a higher effective utilization rate, and the parking space is significantly increased.
  • The steel beam template is perforated through pipelines and air ducts, which saves the clear height under the beam, especially in the basement
  • Through bim-erp information management, realize the integrated intelligent construction of prefabricated buildings, improve the building quality and greatly shorten the construction period.

 

 

临安西林小学
$info.summary
Details 白箭头 黑箭头

Hangzhou Yunqi Town International Convention and Exhibition Center

——Permanent site of world cloud computing

 

The project is located at No. 1, Zhuantang Heshan Road, Xihu District, Hangzhou, and is constructed by southeast grid

It was completed and delivered on September 17, 2015, with a total construction period of only 85 days, creating another architectural miracle.

临安西林小学
临安西林小学
$info.summary
Details 白箭头 黑箭头
四川理工学院宜宾校区白酒学院
四川理工学院宜宾校区白酒学院
$info.summary
Details 白箭头 黑箭头
萧山南都小学
萧山南都小学
$info.summary
Details 白箭头 黑箭头
萧山南二路小学
萧山南二路小学
$info.summary
Details 白箭头 黑箭头
绵阳富乐国际学校
绵阳富乐国际学校
$info.summary
Details 白箭头 黑箭头
台州华东师范大学附属中学
台州华东师范大学附属中学
$info.summary
Details 白箭头 黑箭头

Copyright @ Copyright statement on the website of Zhejiang southeast Grid Co., Ltd 浙ICP备10206285号-1